Progress on Sandstone House

An exciting few days on site at Sandstone House, with the steel frame installed.

05|08|2025 Foundation blockwork completed and the steel frame has been installed.

Previous
Previous

Sketch design schemes

Next
Next

Work begins on Sandstone House